PetroQuest Energy Inc.
  • Oil & gas field infrastructure development
  • 6 months / $11 Million
  • 50 MM/day gas, 1000 BBL/day oil facility
  • Waskey deck installation
  • Well cribbing and flowline bores from wells adjacent to facility
  • Pipeline bores under the Intracoastal Canal for gas sales
  • Modular construction & design utilized to reduce field installation time and cost
  • Loading terminal for metering and barging out oil